Electrical Power System Design Course
(An Award Winning Training Institute for Online Substation Design Training course)
- Electrical Fault Current/short circuit current calculation,
Electrical load flow analysis,
Protection relay coordination,
Motor starting analysis by ETAP
Auto-cad Software for electrical drawing preparation
DIALUX software for Lighting Calculation
- Types of Cables
Construction of Cable, Components of cable & Code for designating cable components
Power Cables: Selection and technical Specification
Cable Selection Based on Current Rating of feeder
HT & LT Cable Sizing Calculation
(Minimum cable size for fault current & full load current, Installed cable Current Rating calculation, Voltage Drop
Calculation of cable, number of cables per phase calculation, Cable Impedances, Maximum Permissible Voltage
Drop & Calculating Maximum Cable Length due to Voltage Drop)
Cable installation method at site & maximum permissible bending radius of cable at site
Cable tray & cable conduit sizing, Cable termination Gland selection, cable marker
Cable schedule preparation
- Difference Between Earthing and ; Grounding, Type of earthing and; difference in System grounding and ; equipment earthing
- Factors Influencing the choice of earthed and unearthed systems and ; Why earthing required
- Earthing method for Industry and ; Building
- Earthing method for Substations or Switchyard
- Earthing method for Power Plants
- EARTHING CALCULATION FOR SUBSTATION OR SWITCHYARD
- Calculation Of minimum Earthing Strip/Conductor Size, Tolerable and ; Acceptable Touch and ; Step Voltage calculation, Grid
- Resistance Calculation, Grid Current Calculation and ; GPR calculation by using IEEE-80 standard method
- EARTHING CALCULATION FOR INDUSTRY and ; BUILDING
- earthing conductor sizing calculation, number of earth pit calculation and earthing pit resistance calculation
- EARTHING CALCULATION FOR POWER PLANT
- earth conductor sizing calculation, number of earth pit calculation and earthing pit resistance calculation
- ELECTRICAL EQUIPMENT EARTHING DRAWINGS
- Transformer, Towers, CT/PT, CB, LA, Wave Trap
- EARTHING DRAWING PREPARATION/ EARTH MAT LAYOUT DRAWING PREPARATION FOR SUBSTATION
- INDUSTRIAL CASE STUDY: Refinement of preliminary design for Substation/switchyard earthing
Transmission Planning, Choice of Route of transmission line, Overhead transmission line Clearance
Selection of conductors for transmission line
Disc Insulator quantity calculation for transmission line to check the transmission line voltage level
Spacing of Conductors in transmission lines
Selection of transmission line towers
Overhead transmission line lightning Calculation protection
- Selection and Sizing/Rating Calculation based on latest industrial practice (IS & IEC) from 11KV to 765 KV
(India Highest operational voltage) & Guideline to make/filling technical data sheet of substation equipments
Lightning/surge arrestor -SELECTION PARAMETERS, SIZING/RATING CALCULATION, DRAWING & LOCATIONS IN SUBSTATION
Current & Voltage transformer (PT, CVT)- SELECTION PARAMETERS, SIZING/RATING CALCULATION, DRAWING & LOCATIONS
Wave trap/line trap & power-line carrier communication requirement
Isolator & Earth switch requirements – SELECTION PARAMETERS, SIZING/RATING CALCULATION, DRAWING & LOCATIONS
Circuit Breaker (VCB & SF6) – SELECTION PARAMETERS, SIZING/RATING CALCULATION, DRAWING & LOCATIONS
MAKING CURRENT CALCULATION, PRE-INSERT RESISTER & CONTROL SWITCHING DEVICE REQUIREMENT, AUTO RECLOSING
Bushing/insulators,
- Substation Single Line Diagram Preparation & selection of bus bar scheme & types of bus-bar schemes
in substation for 11kv,33kv,66kv,110kv,132kv,220kv,400kv, 765kv substation
(Single bus bar, Main & transfer, Double main, Double main & transfer, One & half breaker bus bar schemes)
Electrical system design Parameter selection( Highest system voltage, Power frequency over voltage,
Lightning impulse over Voltage & switching impulse over voltage
SLD preparation for 11kV,33 kV,66 kV,110 kV,132 kV,220 kV,400 kV,765 kV Voltage level
( as of now 765 kV Highest voltage level in India)
PROTECTION RELAY & METERING SINGLE LINE DIAGRAM FOR CONTROL RELAY PANEL (CRP)
Standard Protection relay selections for transmission line /feeder bay from 11 KV to 765 KV voltage
Standard Protection relay selections for Power Transformer feeder
Standard relay selections for Bus Bar, Standard Protection Schemes for Bus coupler/bus sectionalize Bay
Number and location of CTs & PTs – application wise, class of CTs , CT number of secondary core selection
Protection SLD preparation for 11kV,33 kV,66 kV,110 kV,132 kV,220 kV,400 kV,765 kV Voltage
- GIS Substation SLD preparation for 11kV,33 kV,66 kV,110 kV,132 kV,220 kV,400 kV,765 kV Voltage level
GIS Substation Protection SLD preparation for 11kV,33 kV,66 kV,110 kV,132 kV,220 kV,400 kV,765 kV
Design Engineering based on India (CEA & CBIP) & International guide (IEC & IEEE) from 11kV to 765 KV voltage
Type of Substation, why substation required & Process involved in developing of substation/ switchyard
Substation equipment sequence & interconnections
Electrical Clearances (GROUND CLEARANCE, PHASE TO PHASE CLEARANCE, PHASE TO EARTH & SAFETY CLEARANCE) selection
Substation Layout Plan & Section Layout drawing preparation
Control Room building Layout
Benefits of Substation Automation system
Estimation of Substation Plot Land Area Requirements
Substation switching scheme study
Substation material sizing (support structure & oil pit)
3 phase short circuit force calculation electrodynamics force
(required for civil dept. to prepare equipment foundations strength designing)
- Direct Lightning Protection Calculation (DSLP)
Method of lightning protection & Basic consideration for protection
Calculations for evaluating the need for protection
Calculation of protective angles and zone of protection for various forms of air termination
Lightning drawing preparation
- Preparing the major equipment bill of quantity for a substation/switchyard project
Preparing the erection hardware equipment bill of quantity for a substation project
Equipment supply & installation costs
Total cost estimation for substation & switchyards projects & Rate Analysis sheet preparation
- Selection of Transformers, two winding transformer, three winding transformer & auto transformer
requirement of tertiary winding in transformer
Transformer vector group presentation
Transformer cooling type
Standard Practice for selection of transformer % impedance - Transformer sizing
Industrial Practice for selection of Transformer rating for power house & substations from 11KV Voltage
level to 765 KV Voltage level
Differential Protection of transformer
Restricted Earth Fault Protection (REF) protection of transformer & SEF protection
Difference between REF & Differential protection of transformer
Transformer name plate data study
Transformer inspection check list required for factory inspection
Transformer vendor drawing review for design approval
Lux level selection and Lux level calculation- By DIALUX SOFTWARE
Prepare single line diagram for load distribution, Electrical layout in residential building using Auto CAD
Selection of house wiring Sizing and selection of conduit
Sizing and selection of low voltage switchgears (MCB, MCCB, RCB, MPCB)
Layout drawings preparation for house wiring Cable route layout Conduit layout & Power socket layout
- Prepare engineering drawing with us for complete substation project (tender project shall be given by us)
SLD, Protection SLD, Overall electrical layout, Earthing layout, cable routing layout, lightning protection layout,
control room building layout,
- An award winning electrical system design online course with 100 % project and case studies based classes for electrical engineers. IETP provide Top-rated Electrical design online classes with ETAP, Auto-cad and Dialux electrical software training. During the training program, we assign running project for hands -on design practice and job assistance to Electrical Eng. To Join India’s No.-1 Electrical and substation design online course, call us on: +919354439397 / visit to us today
- Practical training report on a complete substation projects for study as a reference after completion of designing training
Online Substation (AIS & GIS) design training program by IETP has won several awards from many power sector companies for providing the quality training
IETP provide complete detailed online training for Substation (AIS & GIS) design engineering for below types of substation:
- Power house (33kV / 11kV)
- Distribution substation (220kV / 132 kV /33 kV/ 11 kV)
- Grid substation (765kV/400kV/220 kV)
- Solar power plant substation
- Substation for wind power plant
The content designed by T &D experts by IEC & IEEE guideline for designing of substation and transmission line, classes conducted online through ZOOM/Microsoft team by real live running substation, project & covering all aspect from bidding to > Energizing.
TRAINING SYLLABUS FOR ELECTRICAL & POWER SYSTEM DESIGN ENGINEERING
Module 1 - ELECTRICAL SOFTWARE’s
- System Study
- Electrical Fault Current/short circuit current calculation, Electrical load flow analysis, Protection relay coordination, Motor starting
- AUTO CAD (for electrical drawing preparation)
- DIALUX
Module 2- PROJECT COST ESTIMATIION (Tender Engineering)
Preparing the major equipment bill of quantity for a substation/switchyard project
- Preparing the erection hardware equipment bill of quantity for a substation project
- Equipment supply & installation costs
Total cost estimation for substation & switchyards projects & Rate Analysis sheet preparation
Module 3- CABLE SELECTION AND CABLE SIZING CALCULATION
- Types of Cables
- Construction of Cable, Components of cable & Code for designating cable
- Power Cables, Control Cables & Instrumentation Cables: Selection and Specification
- Load Details Calculation/ motor load list preparation
- Cable Selection Based on Current Rating of feeder
- Cable installation method at site & maximum permissible bending radius of cable at site
- Cable tray & cable conduit sizing, Cable termination Gland selection, cable marker
- Cable Sizing Calculation
(Minimum cable size for fault current & full load current, Installed cable Current Rating calculation, Voltage Drop
Calculation of cable, number of cables per phase calculation, Cable Impedances, Maximum Permissible Voltage
Drop & Calculating Maximum Cable Length due to Voltage Drop)
- Cable schedule & cable site routing layout
INDUSTRIAL CASE STUDY:
- Discussion of Case studies for reason for Cable Failure / damage at Site
- Transmission line Overhead conductor & underground power cable brief comparison
APPLICABLE STANDARD:
- IS 1554 (1& 2)-: Specification for PVC insulated
- IS 7098 (Part 1 & 2): Specification for Cross-linked polyethylene insulated
IS 1255: Code of practice for installation and maintenance of power cables
Module 4- DESIGN AND ENGINEERING OF TRANSMISSION LINE
- Transmission Planning, Indian Electricity Rules and State Regulations for transmission line, Choice of Route of transmission line, Overhead transmission line Clearance
- Selection of conductors for transmission line and Selection Insulator and fittings
- Spacing of Conductors in transmission lines
- Calculation of SAG and Tension
- Selection of transmission line towers
- Overhead transmission line lightning Calculation
Module 5- EARTHING DESIGN AND CALCULATION
- Factors Influencing the choice of earthed and unearthed systems & Why earthing required
- Earthing method for Industry & Building
- Earthing method for Substations or Switchyard
- Earthing method for Power Plants
Earthing calculation for substation or switchyard
- Calculation Of minimum Earthing Strip/Conductor Size, Tolerable & Acceptable Touch & Step Voltage calculation, Grid
Resistance Calculation, Grid Current Calculation & GPR calculation
Earthing calculation for Industry & Building
- earthing conductor sizing calculation, number of earth pit calculation and earthing pit resistance calculation
Earthing calculation for Power Plant
- earth conductor sizing calculation, number of earth pit calculation and earthing pit resistance calculation
Electrical equipment
- Transformer, Towers, CT/PT, CB, LA, Wave Trap
Earthing drawing preparation/ Earth mat layout drawing preparation for substation
INDUSTRIAL CASE STUDY:
Refinement of preliminary design for Substation/switchyard earthing
Module 6- DESIGN AND ENGINEERING OF SUBSTATION
Designing based on Indian & International guideline (IEC & IEEE) from 11kV to 765 KV voltage level.
- Type of Substation, why substation required, process involved in developing of substation
- AIS & GIS substations
- Selection of bus bar scheme & types of bus-bar schemes in substation for 11kv,33kv,66kv,110kv,132kv,220kv,400kv, 765kv substation
- Substation equipment sequence for interconnection
- Electrical Clearance (Ground, Ph to Ph, Ph to Earth, Safety Clearance) selection
- Substation Layout Plan & Section Layout drawing preparation
- Control Room building Layout
- Substation Automation system design
- Selection of PLC Communication protocol
- Benefits of Substation Automation system
- Cabling of Switchyard
- Direct Lightning Protection Calculation (DSLP)
- Substation switching scheme
Module 7- ELECTRICAL EQUIPMENTS SELECTION & SIZING CALCULATIONS
Selection and Calculation based on latest industrial practice from 415V to 765 KV (Highest operational voltage) voltage level.
- Incoming & outgoing transmission line bay, Bay control Unit (BCU)
- Lightning arrestor or surge arrestor ( specifications, GTP , GA drawing & selection of location)
- Current transformer & Voltage transformer (PT, CVT, CCVT, EMVT)
- Wave trap/line trap & power-line carrier communication requirement
- Isolator, tandem arrangement of isolator & location & requirement of earth switch
- Circuit Breaker ( specifications, GTP , GA drawing & selection of location)
- (Pre-insert resister switching, Control switching device CSD, Auto reclosing requirement)
Insulators, Motor, Diesel Generator, Battery
Module 8- SINGLE LINE DIAGRAM AND PROTECTION & METERING LINE DIAGRAM
- Substation Single Line Diagram Preparation
- For 11kV,33 kV,66 kV,110 kV,132 kV,220 kV,400 kV,765 kV Voltage
- Protection & Metering Line Diagram Preparation/ protection relay selection for substation
- For 11kV,33 kV,66 kV,110 kV,132 kV,220 kV,400 kV,765 kV Voltage
- Transmission Line Protection Relay selection
- Standard Protection Schemes for transmission line /feeder bay for from 11 KV to 132 KV
- Standard Protection Schemes for transmission line/feeder bay for above 132 KV to 765 KV
- Standard Protection Schemes for Power Transformer bay for above 132 to 765 KV
- Standard Protection Schemes for Bus Bar
- Standard Protection Schemes for Bus coupler/bus sectionalize Bay
Number and location of CTs & PTs – application wise, class of CTs
Module 9- TRANSFORMER SELECTION, SIZING & TRANSFORMER PROTECTION
- Selection of Transformers, two winding transformer, three winding transformer & auto transformer requirement of tertiary winding in transformer
- Transformer vector group presentation
- Transformer cooling type
- Standard Practice for selection of transformer % impedance
- Transformer sizing
- Industrial Practice for selection of Transformer rating for power house & substations from 11KV Voltage level to 765 KV Voltage level
- Differential Protection of transformer
- Restricted Earth Fault Protection (REF) protection of transformer & SEF protection
- Difference between REF & differential protection of transformer
- Internal & External Fault in transformer & protection of transformers
- Transformer name plate data study
- Transformer inspection check list required for factory inspection
Transformer vendor data Review
Module 10- LIGHTING DESIGN INTERNAL ELECTRIFICATION HOUSE WIRING DESIGN
- Lux level selection Lux level calculation by Software DIALUX
- Prepare single line diagram for load distribution, Electrical layout in residential building using Auto CAD
- Selection of house wiring Sizing and selection of conduit
- Sizing and selection of low voltage switchgears (MCB, MCCB, RCB, MPCB)
- Layout drawings preparation for house wiring Cable route layout Conduit layout & Power socket layout
- Indian standard study
- Method of lightning protection & Basic consideration for protection
- Calculations for evaluating the need for protection
Calculation of protective angles and zone of protection for various forms of air termination.
Module 11- POWER GENRATING STATION STUDY
- Electrical System study involved in a Thermal Power Plants
- Electrical System study involved in Solar Plants
Electrical System study involved in a Hydro Plants
Module 12- Practical Training Report on a complete substation projects for study as a reference after completion of designing training
Module 13- Study, Analysis and Suggesting Measures for failure of Power & Control Cables in industry
Module 14- Study, Analysis and Suggesting Measures for failure of Power Transformer in industry
Duration:
This 70 hours program consists of 14 modules with industrial meaningful assignments and projects for the electrical business Unit Areas as listed above. These modules will include exposure in system planning, electrical software, estimation of electrical projects & detail design engineering with focus on training-on-the-live project experience that is able to groom and build a strong engineering foundation for the graduate.
Key Benefits
v 10+ Actual industrial Practice Tender Project (Running)
v 70 Hours of mentor lead training
v Interview question discussion during each topic study
v 10+ years experienced mentor